Project health from 0 to 100: how to build an indicator leadership understands

By José Roberto LimaNov 20, 20262 min read
Manager analyzing indicators on a laptop

The project RAG report is one of the most common reports in PMOs and also one of the most debated. When each project manager picks the color for their own project, one person's green is not worth the same as another's. Leadership notices, and the report loses credibility.

Project health from 0 to 100 in OnePlanner

The problem with a manually filled RAG status

  • Personal criteria: a more optimistic project manager and a more cautious one paint the same situation in different colors.
  • One dimension only: the color often reflects schedule alone, leaving out costs or risks.
  • Lagging information: the color changes when someone remembers to update it, not when the data changes.

How to build a 0 to 100 indicator

The idea is to swap opinion for rules. Each dimension gets a score calculated from the project data, and the overall score summarizes them all.

  1. Choose the dimensions: in OnePlanner, they are schedule, cost, scope, risks, changes and issues.
  2. Define the rule for each one: for example, how far the forecast finish has moved from the baseline, or how much of the budget has been consumed relative to progress.
  3. Agree on the ranges: from what score the project is healthy, needs attention or is critical.
  4. Test before publishing: apply the rules to current projects and check whether the result makes sense to people who know the portfolio.

How OnePlanner calculates it

A server-side indicator engine assesses the six dimensions with the same rules for every project, whether from OnePlanner, Microsoft Project or Planner Premium. Ranges are configurable, rules are versioned and a simulator shows the effect of a rule change before it takes effect. Because the calculation runs on the server, nobody can adjust the score just on screen.

How to use it in the portfolio meeting

With the score calculated, the meeting stops arguing about the color and starts discussing the cause. The Project Center lists projects with health next to schedule, work and cost, and the project screen shows which dimension pulled the score down. That leads straight to the right question: what needs to happen for the project to return to the healthy range.

Project Center with the health of each project

See how it works in OnePlanner: dashboards and project health.

See your portfolio's health calculated in a demo. Book a demo.

Frequently asked questions

Are the ranges fixed?

No. Each company defines its ranges, and the rules are versioned.

Can the project manager change the score?

No. The score is calculated on the server from the project data.

Does it apply to Project and Planner projects?

Yes. The same rules apply to any source.